Carlos Bispo

Faculty
This author has not yet filled in any details.
Closed Projects
Acronym | Name | Funding | Dates |
---|---|---|---|
DisNet | Distributed Scheduling for Networks | FCT | 2001|2002 |
DecPUCS | Decentralized Planning Under Uncertainty for Cooperative Systems | FCT | 2007-10|2010-09 |
[1] Carlos Bispo, "The single-server scheduling problem with convex costs", Queuing Systems, Vol. 73, Issue 3, pp. 261-294. DOI 10.1007/s11134-012-9316-8, 2013
[2] P. A. Afonso, Carlos Bispo, "Railway Traffic Management: Meet and Pass Problem", Journal of System and Management Sciences, Vol. 1, No. 6, December, 2011
[3] Sridhar Tayur, Carlos Bispo, "Managing simple re-entrant flow lines: Theoretical foundation and experimental results", IIE Transactions, Vol. 33, No. 8, 2001
[4] Jose A. A. Moreira, Carlos Bispo, "An echelon inventory-based single-stage cost function for a two-station tandem system", Production Planning and Control, Vol. 10, No. 7, 643-649, 1999
[5] Luís Custódio, João Sentieiro, Carlos Bispo, "A Fuzzy Decision System for Production Planning and Scheduling", IEEE Transactions on Robotics and Automation, Special Issue on Computer Integrated Manufacturing, 1994
[6] Luís Custódio, João Sentieiro, Carlos Bispo, "Production Planning and Scheduling using a Fuzzy Decision System", IEEE Transactions on Robotics and Automation, Vol. 10, no. 2, 1994
[7] Carlos Bispo, João Sentieiro, "Adaptive Scheduling for High Volume Shops", IEEE Transactions on Robotics and Automation, no. 6, Vol. 8, pp. 696-706, 1992
[1] João Sequeira, Carlos Bispo, João Sentieiro, "Distributed Control of a Flexible Manufacturing Plant using Learning Automata", in Parallel and Distributed Computing in Engineering Systems, G. Tzafestas, P. Borne, L. Grandinetti Eds., pp. 327-332, North-Holland Publishers, Netherlands, 1992
[1] Carlos Bispo, "Stability of re-entrant flow lines", Proc. of OR 2013 - International Conference on Operations Research, Rotterdam, The Netherlands, 2013 - PDF
[2] Carlos Bispo, "Active Idleness Scheduler with Simulated Annealing", Proc. of INCOM 2012 - 14th IFAC Symposium on Information Control Problems in Manufacturing, Bucharest, Romania, 2012 - PDF
[3] Carlos Bispo, "Single Server Scheduling Problem. Optimal policy for convex costs depends on arrival rates", Proc. of MISTA 2011 - 5th Multidisciplinary International Scheduling Conference, Phoenix, USA, 2011
[4] P. A. Afonso, Carlos Bispo, "Railway Traffic Management. The Meet & Pass Problem", Proc. of LISS 2011 - 1st International Conference on Logistics, Informatics and Service Science, Beijing, People's Republic of China, 2011
[5] F. Mendonca, Carlos Bispo, "Smooth Priorities for Multi-Product Inventory Control", Proc. of INCOM 2009 - 13th IFAC Symposium on Information Control Problems in Manufacturing, Moscow, Russia, 2009
[6] Carlos Bispo, Zita Fernandes, Marta Rebello, "Simulating Activity Networks in JAVA", Proc. of the 6th EUROSIM Congress on Modeling and Simulation, Ljubljana, Slovenia, 2007
[7] Carlos Bispo, "Renovacao Tecnologica ou Renovacao na Gestao de Operacoes?", 1º Congresso Nacional da Administracao Publica, Lisbon, Portugal, 2003
[8] Jose A. A. Moreira, Carlos Bispo, "Performance Improvement through Active Idleness", Proc. MED2003 - 11th Mediterranean Conference on Control and Automation, Greece, 2003
[9] Jose Moreira, Carlos Bispo, "Stability or Stabilizability? Seidmans FCFS example revisited", 10th Mediterranean Conference on Control and Automation, Lisbon, Portugal, 2002
[10] Nuno Orfão, Carlos Bispo, "Make-to-Stock vs. Make-to-Order in the Glass Manufacturing Industry", POMS-BRAZIL Conference, Guaruja, Brazil, 2001
[11] Nuno Orfão, Carlos Bispo, "An Inventory Decision Support System to the Glass Manufacturing Industry", 12th International Meeting of the Euro Working Group on Decision Support Systems, Cascais, Portugal, 2001
[12] Carlos Bispo, "Smooth Priorities for Make-to-Stock Inventory Control", Multi-echelon Inventory Systems Conference, U.C: Berkeley, U.S.A, 2001
[13] J. Moreira, Carlos Bispo, "An Echelon Inventory Based Single Stage Cost Function for a Two Station Tandem System", Proceedings of the Rensselaer's International Conference on Agile, Intelligent and Computer Integrated Manufacturing (CAICIM), Troy, NY, 1998
[14] Luís Custódio, Carlos Bispo, João Sentieiro, "A Hierarchical Fuzzy Control System for Short-Range Planning and Scheduling", Proceedings of the Rensselaers's Third International Conference on Computer Integrated Manufacturing, Troy, NY, 1992
[15] V. Marques, Carlos Bispo, João Sentieiro, "A system for the compactation of two-dimensional irregular shapes based on simulated annealing", Proc. of International Conference on Industrial Electronics, Control and Instrumentation (Cat. No. 91CH2976-9); Kobe, Japan, 1991 - PDF
[16] Luís Custódio, Carlos Bispo, João Sentieiro, "Fuzzy Logic Applied to Production Scheduling", Workshop CIM in the Process Industry, Athens, Greece, 1991
[17] L. Carvalho, R. Almeida, Carlos Bispo, João Sentieiro, "An Integrated Environment for Planning and Scheduling in Flow-Shop Manufacturing Plants", Proceedings of the 2nd International Conference on Computer Integrated Manufacturing, RPI, Troy, New York, USA, 1990
[18] Carlos Bispo, João Sentieiro, "An Extended Horizon Scheduling Algorithm for the Job-Shop Problem", 1st International Conference on Computer Integrated Manufacturing RPI, Troy, New York, 1988
[1] Ivone Fernandes, Luís Custódio, Carlos Bispo, "Metodos “classicos” e multi-agentes num sistema de manufactura", Technical Report Internal Report RT-705-00, 2000
[2] Luís Custódio, João Sentieiro, Carlos Bispo, "Fuzzy Logic Applied to Production Planning and Scheduling", AIMS Lab-TR 701-93, 1993